Romania: Delay in obtaining an electrical connection (days)

The data set Delay in obtaining an electrical connection for Romania contains data from the year 2002 to 2021.

In Romania in the year 2019 32.8 days

Definition: Delay in obtaining an electrical connection is the average wait, in days, experienced to obtain an electrical connection from the day an establishment applies for it to the day it receives the service.
Survey by: Weltbank
Database: World Development Indicators
Source: http://data.worldbank.org/indicator/IC.ELC.DURS

All countries: Delay in obtaining an electrical connection (days)

Land Delay in obtaining an electrical connection (days)
Suriname 262.3
Lebanon 235.9
Ethiopia 194.3
Benin 193.2
Czech Republic 151.5
Hungary 144.2
Palestinian Territory 129.3
Tunisia 128.3
Syria 118.4
Serbia 113.6
Afghanistan 111.3
France 104.2
Moldova 99.5
Estonia 91.1
Bangladesh 84.7
Pakistan 82.8
Malta 79.9
Peru 79
Kenya 78.9
Egypt 76.9
All data sets...

Compare Romania with another country: Delay in obtaining an electrical connection (days)

Romania Add country

More data for Romania

We have 25,998 record for Romania in our database. Here is a selection of records for Romania.

Electricity

General

Exclusive contents

Register for Tilasto by Genios for unlimited access
  • Full acces to 3.7 million statistics
  • Download as PDF, JPEG, SVG, PNG, Excel, Powerpoint
  • All the advantages of a Genios-Premium-Account
You already have an account?

Exclusive contents

Register for Tilasto by Genios for unlimited access
  • Full acces to 3.7 million statistics
  • Download as PDF, JPEG, SVG, PNG, Excel, Powerpoint
  • All the advantages of a Genios-Premium-Account
For individual users
only 5,30 € / Month
(Duration 12 months)
You already have an account?
Our offer for
Our offer for