Brazil: Delay in obtaining an electrical connection (days)
The data set Delay in obtaining an electrical connection for Brazil contains data from the year 2002 to 2021.
The data set Delay in obtaining an electrical connection for Brazil contains data from the year 2002 to 2021.
Land | Delay in obtaining an electrical connection (days) |
---|---|
Suriname | 262.3 |
Lebanon | 235.9 |
Ethiopia | 194.3 |
Benin | 193.2 |
Czech Republic | 151.5 |
Hungary | 144.2 |
Palestinian Territory | 129.3 |
Tunisia | 128.3 |
Syria | 118.4 |
Serbia | 113.6 |
Afghanistan | 111.3 |
France | 104.2 |
Moldova | 99.5 |
Estonia | 91.1 |
Bangladesh | 84.7 |
Pakistan | 82.8 |
Malta | 79.9 |
Peru | 79 |
Kenya | 78.9 |
Egypt | 76.9 | All data sets... |
We have 25,881 record for Brazil in our database. Here is a selection of records for Brazil.
Data set | Country ranking | Source | Country comparison |
---|---|---|---|
Population, total | Show country ranking | Show source | |
Area (sq. km) | Show country ranking | Show source | |
Gross domestic product in exchange rates (US $) | Show country ranking | Show source | |
Gross domestic product per capita (US $) | Show country ranking | Show source |